Dilsterboy
New member
- Joined
- Jan 28, 2013
- Messages
- 30
- Reaction score
- 0
- Points
- 0
I have a 1972 lemans and im not sure if i put it in right. The is the order is put the linkage kit in. First you have the bolt then washer, spacer, control arm, spacer, washer, brass tube part, washer, spacer, sway bar, spacer, washer, nut. Thats the prder but i wish i could upload the pics. Im confused ive forgotten which way my sway bar goes in. With the flex or bent joint of the bar facing upward or downward idk!
